<?xml version="1.0" encoding="UTF-8"?><!-- generator="wordpress/1.5.2" -->
<rss version="2.0" 
	xmlns:content="http://purl.org/rss/1.0/modules/content/">
<channel>
	<title>Comments on: Floodwalls seem to have been built to ACE specifications</title>
	<link>http://katrinacoverage.com/2005/12/14/floodwalls-seem-to-have-been-built-to-ace-specifications.html</link>
	<description>Analyzing the news reports and politics of the New Orleans hurricane.</description>
	<pubDate>Wed, 20 Aug 2008 12:28:39 +0000</pubDate>
	<generator>http://wordpress.org/?v=1.5.2</generator>

	<item>
 		<title>Comment on Floodwalls seem to have been built to ACE specifications by: roux</title>
		<link>http://katrinacoverage.com/2005/12/14/floodwalls-seem-to-have-been-built-to-ace-specifications.html#comment-108</link>
		<pubDate>Thu, 15 Dec 2005 17:04:36 +0000</pubDate>
		<guid>http://katrinacoverage.com/2005/12/14/floodwalls-seem-to-have-been-built-to-ace-specifications.html#comment-108</guid>
					<description>Though I read somewhere that the Sewage and Water Board had dredged the canals after they were built making the bottom of the canal lower than the sheet piling.</description>
		<content:encoded><![CDATA[	<p>Though I read somewhere that the Sewage and Water Board had dredged the canals after they were built making the bottom of the canal lower than the sheet piling.
</p>
]]></content:encoded>
				</item>
</channel>
</rss>
